General Information
|
|
|
|
Department for this solicitation:
|
Procurement
|
|
Date Prepared:
|
01/14/26
|
Types:
|
R3-RFQ
|
|
Advertisement Type:
|
|
|
Solicitation/Project#:
|
OSM 11(3261)101.1
|
Solicitation/Project Title:
|
AMRP S. Fork NW, E. Taylor Twp, Cambria Cnty
|
|
Description:
|
Principal Items of Work and Approximate Quantities are:
Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter), 6,980 L.F. Implementation of the Erosion and Sediment Pollution Control Plan – Weighted Sediment Filter Tube, 89 L.F. Clearing and Grubbing, 111.7 ACRE Grading - Grading, 1,852,294 C.Y. Grading – Hummocky Piles, 25.8 ACRE Grading – Ripping, 27.6 ACRE Planting – Planting Preparation, 111.7 ACRE Planting – Tree Seedlings, 36,318 EACH Channel Excavation – Channel Excavation, 337 C.Y. Channel Excavation – Stream Channel Restoration, 256.7 C.Y. Erosion Matting, 9,125.9 S.Y. Subsurface Drain, 675 L.F.
Beginning on the Issue Date, free copies of bid documents can be obtained by going to www.BidExpress.com, PA Department of Environmental Protection.
|
|
|
|
|
Go to Solicitation Tabulations
|
No Tabulations exist for OSM 11(3261)101.1.
|
|
Go to Awards
|
No Awards exist for OSM 11(3261)101.1.
|
|
Go to Contracts
|
No Contracts exist for OSM 11(3261)101.1.
|
|