Description:
|
03/15/2024 - NOTE: This ADDENDUM #2 is to clarify the answer given on Addendum #1 that stated, “Limestone is NOT a requirement and should not be used”. PLEASE IGNORE THAT, the parent material CAN BE either limestone or sandstone.
************************************** 03/14/2024 - NOTE: Addendum 1 has been added to this solicitation to answer questions raised on the required 4-Minus material to be used in this project. An incorrect Product Category number was used in the bid Line Item that caused the term "Limestone" to be added. Limestone is NOT required and should NOT be used in this 4-Minus project. *********************************** Department of Conservation and Natural Resources (DCNR), Gallitzin Forest District, requires the delivery and tailgating of approximately 1200 tons of 4” MINUS material to Strip Road, Adams Twp., Cambria County.
|
|
|
Go to Solicitation Tabulations
|
|
Go to Awards
|
No Awards exist for 6100060693.
|
Go to Contracts
|
No Contracts exist for 6100060693.
|
|