General Information
|
|
Department for this solicitation:
|
Procurement
|
Date Prepared:
|
09/27/19
|
Types:
|
R3-RFQ
|
Advertisement Type:
|
|
Solicitation/Project#:
|
OSM 02(0459)302.1
|
Solicitation/Project Title:
|
AMR, Chalfont Run, Churchill Bor., Allegheny Cty.
|
Description:
|
The principal items of work and approximate quantities are: Inlet Boxes, 2 Each Subsurface Drains - Tie-In to Existing Concrete Inlet, 1 L.S. Subsurface Drains - Twelve-Inch (12") N-12 Dual Wall HDPE Solid Pipe, 102 L.F. Subsurface Drains - Eight-Inch (8") PVC SDR-35 Solid Pipe, 42 L.F. Subsurface Drains - Eight-Inch (8") PVC SDR-35 Perforated Pipe with Cleanouts, 214 L.F. Subsurface Drains - PA DOT 2A Stone, 32 TON Subsurface Drains - AASHTO No. 1 Stone, 122 TON Subsurface Drains - Pine Tree and Stump Removal and Disposal, 1 L.S. Subsurface Drains - Removal and Disposal of Excess Excavated Material, 122 C.Y. Subsurface Drains - In-Kind Replacement, 1 L.S. Subsurface Drains - Pavement Replacement – Binder Course, 34 S.Y. Subsurface Drains - Pavement Replacement – Wearing Course, 34 S.Y. Beginning on the Issue Date, free copies of bid documents can be obtained by going to www.BidExpress.com, PA Department of Environmental Protection.
|
|
|
Go to Solicitation Tabulations
|
No Tabulations exist for OSM 02(0459)302.1.
|
Go to Awards
|
No Awards exist for OSM 02(0459)302.1.
|
Go to Contracts
|
No Contracts exist for OSM 02(0459)302.1.
|
|